Moscow
08/31/2017 Customer
Repair of soft roofing. dismantling the old coating 2 layers. local screed repair, installation of new 2 layers. 1 roof is approximately 1000 m2, 350 RUR/m2, 8-10 people are needed for 1 roof. the instrument is desirable for the performer. We'll supply the expenses. hostel accommodation with subsequent deduction. advance payment for food from the 3rd day. payment upon completion of work. place of work m. academic
08/31/2017 Customer
Two-roomed flat 45 sq. m. The rough work has been done: plaster, screed, partitions have been erected, electrical installations have been carried out. Do everything else: cover the ceilings with plasterboard, some electrical, plumbing, floors, putty the walls, wallpaper, bathtub, etc.
Korolev, Moscow region
08/31/2017 Customer
Type of work performed. Basement: Total scope of work - 905.5 sq.m., including:
1. Natural stone (granite)
1.1. On the subsystem - 41.8 sq.m.
1.2. on glue - 64.7 sq.m.
2. Porcelain tiles 2.1. On the subsystem - 212 sq.m. 2.2. On glue - 587 sq.m. Total for the subsystem - 253.8 sq.m. Total for glue - 651.7 sq.m. https://yadi.sk/d/a89kjDu13HyQUM
3 The cost of cladding work on the subsystem is 1,700 rubles/m2 x 253.8 m2 = 431,460 rubles. 3.1. The cost of cladding with glue is 1000 rubles/m2 x 651.7 m2 = 651,700 rubles. 3.2. TOTAL COST OF COVERING THE PITCH RUB 1,083,160.
4 Unloading by the Contractor
5 Lifting by Contractor
7 Total cost of work including VAT, rub. RUB 1,083,160
8 start of work 1.09.17. 9 completion of work 09.25.17. 10 operating mode from 8.00 to 08.00
11 number of days per week 7 12 number of shifts 2 13 Required number of teams/workers in a team 10 people 14 Procedure for payment for work in the form KS-2 and KS-3 15 advance payment 5,000 rubles. per person 3 days after going to work 16 frequency of acceptance of work weekly (Monday is the day of acceptance of completed work)
17 payment deadline for accepted work is weekly, within 3 working days
18 penalties under the terms of the contract annex-agreement Technological organization of work:
19 with scaffolding plinth yes 20 with cradles no 21 with scaffolding yes 22 with climbers no 23 other 24 provision of material from the Customer
25 provision of consumables (drills, augers, etc.) from the Contractor
26 provision of equipment, scaffolding for the plinth are provided for the duration of the work under the contract
08/31/2017 Customer
Welding of brackets (hangers) on support columns and beams, installation of rods and turnbuckles, installation of trusses (from top to bottom). Installation of trusses for a cold screen: Axis 1" Facade 1: https://yadi.sk/d/dkQGk7XN3Hc5nC Length of trusses 6 pcs x 53.316 m.p. = 320 m.p. weight of trusses (without rods) 2.93 tons 3 Total cost works, RUR per m2 including: 1750 RUR/linear m.
3.1. Installation (welding) of corners on support columns and welding of hangers on m/beam 3.2. Installation of rope and rods 3.3. Truss installation 4 Unloading by Contractor
5 Lifting by Contractor
6 storage on site
7 Total cost of work, rub. (including VAT 18%) 560,000 rub.
8 start of work 1.09.17. 9 completion of work 09.20.17. 10 operating mode in two shifts of 12 hours from 8.00 to 08.00 11 *number of days per week 7 12 *number of shifts 2 13 Required number of teams/workers in a team 2 teams of 4-5 people.
14 Procedure for payment for work in the form KS-2 and KS-3 15 advance (For mobilization: food and accommodation) 5,000 rubles. per person 3 days after going back to work
16 frequency of acceptance of work is weekly (Monday is the day of acceptance of completed work)
17 payment deadline for accepted work is weekly, after signing within 3 working days
18 penalties under the terms of the contract annex-agreement Technological organization of work: 19 with scaffolding no 20 with cradles no 21 with scaffolding no
22 climbers yes, contractor climbers 23 other 24 provision of material from the Customer 25 * provision of consumables (drills, augers, etc.) from the Contractor
26 provision of contractor winch equipment
27 quantity of equipment 2
28 *Providing contractor with tools
29 *Providing special clothing with special clothing
08/31/2017 Customer
Perform a 4-slope rafter roof on a private house, price 1,000 rubles/sq.m. Roof structure: - rafters; - wind-moisture-proof film; - lathing; - plywood; - soft tiles; - insulation on the ceiling. 30 km. from MKAD Minskoe highway
08/31/2017 Customer
Execute electric installation work according to the project. Administrative building. Laying cables, trays, connecting panels and equipment. Citizenship of the Russian Federation. (entrance with passes) Payment at the rate of 3000 rubles. in 1 day. Some work will have to be done at night.
There are many ways for a customer to find their contractor and vice versa. Our website offers one of these options. On this page you can place your order or tender for apartment renovation or construction works, after which free teams will offer prices, terms, estimates, contracts, etc.
Having received several of these preliminary proposals, you can get a clearer picture of your construction order or tender in terms of price and timing.
Such systems for building partnerships have already become firmly established on the Internet and have now become common practice.
When receiving responses to your tender or order, there are several features to consider:
- Low prices are offered by teams that have been unemployed for a long time or have just formed. Often this involves subsequent manipulations with estimates, prices, volumes and scope of work.
- On the other hand, experienced, overworked teams and firms may not take on some construction contracts due to their insignificant volumes.
At the same time, with the help of our website you can significantly save time searching for your company or team, and find out more accurately real price your order for apartment renovation or construction contract.
Information about orders and tenders is kept up to date. After a year, the announcement of an order or tender is deleted automatically.
New tenders
to view all tenders and orders in the region you need
Repair is needed in a new panel building, microdistrict. Severny, Moscow. Scope of work: electrician: - installation of a niche in a concrete slab for an electrical panel, installation, assembly of the panel - installation of grooves in a concrete slab for cable laying, cable laying - installation of holes in a concrete slab for a socket/switch - 30 pcs. - installation of holes in the gypsum board\PGB for a socket\switch - 18 pcs. - installation + disconnection of distribution boxes - installation of electrical points (socket, switch) 48 pcs. - installation of plumbing fixtures: - assembly\installation of the cold water/hot water supply manifold group (ball valve, sump valve, pressure reducer, meter, check valve, 100 micron filter, manifold, water hammer compensator) - installation of grooves in a concrete slab for sewer and water pipes. - installation of hot water/hot water outlets - wiring arrangement/installation of sewerage points - installation + connection of a bathtub (cast iron), sealing the junction of the bathtub with the wall - installation + connection of a washbasin, sealing the junction with the wall - 2 pcs. - installation + connection of a toilet - installation + connection of a water heated towel rail - connection of a mixer - 3 pcs. ventilation: - installation\installation of a PVC air duct on the ceiling - 3.5 m.p. - arrangement of a through hole in the wall for the air duct - installation of a fan - installation of a fan. wall gratings: - dismantling, foaming and sealing of interpanel seams - 17 m.p. - plastering the walls along the beacons - 42m2 - waterproofing the walls - 4m2 - erection of partitions (gypsum plasterboard\pgb) - 8m2 - formation (narrowing) of the doorway - 8 m.p. - device for connecting walls and partitions made of gypsum plasterboard\PGB, sizing with sickle tape - 29 m.p. - puttying walls for wallpaper (+priming, sanding) - 107.5 m2 - puttingtying walls for painting (+primer, sanding) - 6 m2 - leveling arched openings at 90 degrees, under wallpaper - 5 m.p. - tiling of walls (including surface preparation, sorting, cutting tiles, grouting) - 25 m2 - painting of partitions in 2 layers - 6 m2 - wallpapering - 107.5 m2 - installation of window slopes - m.p. 14.5 floor: - installation of a self-leveling floor - 40.5 m2 (possible only for laminate) - installation of waterproofing of the floor with access to the walls
Renovation of an office space (-42 m2, ceiling height 3 m) is needed: installation of an Armstrong ceiling, installation of lamps (10 pieces + electrics - 4 switches), construction of walls (2 pieces) of plasterboard with insulation, painting of all walls, dismantling + preparation flooring + laying linoleum + baseboards. Installation of doors - 2 pcs...... m. Ryazansky Avenue.
I am the owner of the house and I ask that only performers contact me strictly; I will strictly ignore any intermediaries, “foremen” and other agents! Ready to start work immediately. Repairs need to be carried out in 2 rooms - a porch (about 13 sq. m.) and a room (21 sq. m.). . A short list of work on the porch: Preparing concrete walls for painting (including plaster, putty and fiberglass covering) Dismantling the old metal door and installing a new one. Installation of one electric current. Dismantling of old floor tiles. Installation of screed up to 50 mm. Laying of new floor tiles (ceramic granite). Room Installation of a 2-level plasterboard ceiling Installation of ice tapes around the perimeter of a plasterboard ceiling Installation of 2 levels interior doors Making decorative niches from plasterboard Plastering the room according to beacons All concrete and plasterboard parts of the room are covered with fiberglass Starting and finishing putty of the entire room Painting the walls in 3 layers of paint Electrical: Installation of 10 sockets Installation of 4 transformers for LED strips Installation of an RF module for LED strips Installation of a chandelier Installation of a sensor and underfloor heating controller All electrical equipment in the room is reinstalled Installation of 2 differential circuit breakers and 1 conventional circuit breaker Installation plastic window sills Shifting 2 heating radiators and adding another radiator. Lay hot and cold water from boiler room Gasket sewer pipe 50mm to the existing sewer. Floor installation: Laying penoplex "foundation" 50mm Laying reinforcing mesh Laying heated floors Installation of screed up to 50mm Laying cork underlay Laying laminate
3-room apartment, 74 meters, naked. Only rough work and a turnkey bathroom/unit. What is needed: a team of 2-3 people. Construction of walls, plastering on lighthouses, putty for wallpaper, bathroom. turnkey unit, all electrics, all plumbing equipment No need: we don’t do wallpaper or ceilings, we don’t do doors, we don’t do floors. Only direct contractors, no intermediaries, only the Russian Federation Urgent! salary 250000r Nakhabino
A team is required to carry out a comprehensive luxury renovation of an apartment without redevelopment. Elite class apartment with an area of 250 sq. meters, ceiling height 3.20 Work needed, laying tiles from natural stone in the bathrooms (3 bathrooms), a complex radial multi-level plasterboard ceiling, cobwebs on the walls and finishing putty with painting (wallpaper and Venetian), parquet floors and natural stone tiles, lighting connections, everything is turnkey. All engineering has already been installed - heating, water, electrical, ventilation, air conditioning. All work must be carried out strictly according to the project and design project. Work can be performed separately if you are a narrow but excellent specialist. For example, only all painting work.
I am the owner of the house and I ask that only performers contact me strictly; I will strictly ignore any intermediaries, “foremen” and other agents! Ready to start work immediately. Repairs need to be carried out in 2 rooms - a porch (about 13 sq. m.) and a room (21 sq. m.). . A short list of work on the porch: Various woodwork, small volume. Preparing concrete walls for painting (including plaster, putty and fiberglass covering) Dismantling the old metal door and installing a new one. Installation of one electric current. Dismantling of old floor tiles. Installation of screed up to 50 mm. Laying of new floor tiles (ceramic granite). Room Installation of a 2-level plasterboard ceiling Installation of ice strips around the perimeter of the plasterboard ceiling Installation of 2 interior doors Making decorative niches from plasterboard Plastering the room All concrete and plasterboard parts of the room are covered with fiberglass Starting and finishing putty of the entire room Painting the walls in 3 layers of paint Electrical: Installation of 10 sockets Installation 4 transformers for LED strips Installation of an RF module for LED strips Installation of a chandelier Installation of a sensor and controller for a heated floor All electrics in the room are re-installed Installation of 2 differential circuit breakers and 1 regular circuit breaker Installation of plastic window sills Displacement of 2 heating radiators and adding another radiator Install hot and cold water from the boiler room Laying a 50mm sewer pipe to the existing sewer. Floor installation: Laying penoplex "foundation" 50mm Laying reinforcing mesh Laying heated floors Installation of screed up to 50mm Laying cork underlay Laying laminate
Good afternoon. I am looking for a craftsman or team to renovate an apartment completely on a turnkey basis. Duration 1.5 months. We need an experienced specialist who is not doing repairs for the first time, is well versed in materials, and is ready to explain what he is doing and why, why so many materials are needed, and give recommendations on how to do it better. Scope of work - one-room apartment (40 sq. meters). For rough repairs you need to do: 1. Electrical panel in the hallway. For it you will need to groove the wall. 2. Transfer of sockets. 3. Remake the bathroom water supply box. The final renovation must be done completely: 1. Walls and ceilings for painting. 2. Stretch ceiling in the bathroom. 3. Tiles, heated floors, laminate. 4. Installation of bathtubs and plumbing fixtures. 5. Installation of doors, baseboards. 6. Shelves in the bathroom and utility room. We also need you to deliver the materials yourself. Payment for materials in advance after agreeing on the list of materials you need. Payment for work upon completion of work. No earlier than once a week. We can only come to the site on weekends. How many stages of work there will be and what they will be will be determined by you and agreed with us before work begins. The budget is 150 - 200K rubles. We ask interested craftsmen to send photographs of the work done, recommendations and the budget for which you are willing to make repairs. We can show the object on the weekend. We can then take photographs of the property upon request.
We invite you to take part in open construction tenders on the MirStroyek.Ru Moscow portal.
Individuals and companies can post construction tenders for free and act as a Customer after registering on the website. Any visitor to the portal, including unregistered ones, can be a participant.
You can receive notifications about new tenders using our Telegram channel - telegram.me/mirstroek, as well as to your email by subscribing to our daily newsletter. The frequency of the newsletter is once a day from 19:00 to 21:00 Moscow time!
All, 1448 |
- 29.08.2017
Our company is a general contractor. Well-coordinated teams of masons with a working foreman are required for large volumes of internal block and brick laying. We work only with teams!! Required 50.....
Carrying out work on major renovation 12 rooms, cafes, corridors and utility networks of the middle wing of the hotel. Statement of scope of work with estimates, technical task, work schedule, and contract form.....
Teams of masons are required for a new building in Moscow. 1. Tongue and tongue ridge 250 R/m2, 2. Ceramic block (400X200X200) partitions - 1800 R/m3, 3. Brick 1.5 - 2200 R/m3, 4. Gas block 500X400X200 - 1350 R/m2. 5. Related.....
Helper workers needed. All questions by phone.
Installers required for clinker facade. A 30-story building with scaffolding. Total volume 50,000 sq. m. Captures of 5,000 sq. m. 1500 rub. sq.m. Accommodation in a hostel, advance payment for food. Payment 2 times per.....
A team of masons is required for the PGP, nationality does not matter, the volumes are large, housing on site, 200 rubles/m2, payment twice a month, weekly advances.
Object: construction of 2 residential buildings (Monolith. Piles, slab, columns, floors. Inventory formwork) according to ready-made projects, with a total area of 2000 m3, 2 floors each. Without intermediaries, the contract is concluded.....
We will take on a contract in Moscow and St. Petersburg for the installation and welding of metal structures for any purpose. Under a brigade agreement or a Legal Contract agreement. All employees are Slavic citizens of the CU. Cont. WHATSAPP.....
Urgently, for the installation of metal structures (entrance group), a team with its own tools is required.
The premises at the site must be tiled. Volume 280 m2. The cost of the wall is 420 rubles. m2, floors - 380 rub. m2. Alexey 8-926-730-68-67
To carry out routine repairs at the college, a team of station wagon finishers is needed. PRIVATE teams only. Work by volume. Citizenship is strictly of the Russian Federation or the customs union. Tel. 8-968-994-70-09.....
The following work needs to be done at the construction site - laying out the beam 280m2-800 RUR. 1 m2; - laying granite 56 m2-1200 rub. 1 m2; - plaster 28 m2-270 rub. 1 m2. Sparrow Hills. Tel. 8-968-994-70-09.....
Brickwork of external walls is 90 cm thick. Volume is 1500 m3. Not necessarily teams. 2300 rubles per m3. Accommodation on site is possible. RF. m.Petrovsko-Razumovskaya. Igor Vasilievich
We require teams from the Russian Federation, Belarus and Kyrgyzstan ready to begin work on dismantling, repair and finishing office premises. (screed, plaster, tiles, plasterboard, painting, wallpaper, doors, plumbing, etc.). Full price.....
Major repairs one room apartment in a new building, 44 m2. Ceiling 309. We are not making a loggia. We don't provide heating. It is necessary to erect 6 meters of partitions (foam block). Turnkey electrician 9 lighting points.....
It is required to carry out a turnkey renovation of a 2-room apartment (56 sq.m.). Studio apartment, Resale, Electrical, Plumbing, Wall alignment, Wallpaper, Decorative, GKL ceiling, 56 sq.m., Call.....
A welder or a small team with their own equipment is required.
It is required to sell large volumes of wood concrete blocks. Sizes: 40/20/20,40/20/12.
A team is required for the following work (budget 200 thousand rubles for 2 roofs): - relaying an already built roof (metal tiles) on two neighboring houses (house 11X7.6), in connection with raising the walls; assembly.....